Spin Doctor Level Head
Turn a reciprocating saw into a grout removal tool
Simply depress the lever with one hand to eliminate lippage
City skyline
Level & align tiles on-the-spot after tile is set into mortar
City skyline
Also available in 100pc bucket
Rescue Clamp System
Eliminate uneven tile edges during installation with one hand!
The Turn Buckle Rescue Clamp allows users to level and align tiles on the spot. This fully reusable component is unlike anything on the market today. Not only can it be used as a stand alone lippage tuning product, but it will also work in conjunction with any other system on the market.
1. Insert pin parallel into the grout joint, then twist square base 90° into position.
2. Simply press the lever down until it clicks into place.
3. *Important* Immediately after the mortar has cured to manufacturer’s specifications, simply flip the lever the opposite direction to release.
4. Twist the square base back 90°, unlocking the pin parallel to the grout joint, allowing it to be removed.
Item # | Description | Case Qty. |
---|---|---|
LSTB20 | Turn Buckle 20pc. Package | 10 |
LSTB100 | LSTB100 Turn Buckle 100pc. Bucket | 8 |
T-pin design allows SDLH to be inserted after tile is installed in fresh mortar
Works great on walls with RTC Horseshoe Shims
Can be used as a primary or a rescue clip system
100% REUSABLE Lippage Control & Rescue Clip System
The Spin Doctor Level Head is a 100% REUSABLE lippage control & rescue clip system. This system allows users to achieve a smooth lip-free finish on a large variety of tile. With no need to purchase consumable components, this is on e of the best investments that can be made by any installer. Once tile is embedded into your mortar, use Spin Doctor Level Head to make any necessary micro-adjustments to ensure a flat finish. It can also be used as a rescue clip when your primary leveling system experiences premature breakage of clips or posts.
1. Insert pin parallel into the grout joint, then twist square base 90° into position.
2. Easily spin the red leveling cap until the T-pin begins to engage. Then tighten until both surfaces are flush.
3. *IMPORTANT:
Immediately after the mortar has cured to manufacturer's specifications, partially loosen the red cap and twist the black base 90° counter-clockwise to remove.
Item # | Description | Case Qty. |
---|---|---|
SDLH | Spin Doctor Level Head 50pc. Box | 12 |